VBMS – EDF Energy Renewables - 66 kV separable connectors
26-02-2018
The OJC (Offshore Junction Chamber) was developed especially for this project as a plug-and-play solution, enabling a derivation between the array cables and the tower cable
The array cables can be connected before the tower is erected.
48 turbines, 144 MW, 1 OJC/turbine
-
First offshore wind farm with 66 kV connection
-
3 arrays with 5 turbines each (MHI Vestas V164-8.0 MW)
-
66 kV inter-array cable system with Nexans power accessories was supplied in 2017
EUROMOLDÒ separable connectors R909TB, R909PB, R900DR