Our customer had a planned lighting installation in a factory and faced the same challenges as many electrical contractors – do any of these sound familiar?
-
Factory must remain fully operational throughout the installation.
-
Limited window of opportunity to get the job done.
-
Must come in below budget.
-
Needs to be a flexible system allowing for future changes as and when business requirements change.
In these circumstances, whilst a lot of people would persevere with the traditional methods of cable and trunking, our installer felt a fresh approach was needed to meet his customer’s needs.
So he contacted Graziadio UK and with just 6 different products to discuss we were able to provide a neat, clean and flexible answer to his quandary that was fast to install and low cost.
Just 5 components to complete an order makes it an easy product to understand and visualise.
At this point, everything was looking very promising with the only concern being around delivery – busbar systems take weeks for delivery…..don’t they?
Well, the answer in this case is no, as the entire order was supplied from UK stock meaning it was delivered in just 2 days!
So all that was left was the installation, using our GLS busbar system, he was able to complete Phase 1 of the installation in 50% of the time that it would have taken using traditional methods. But did the end user get everything they wanted?
-
The factory remained operational throughout the busbar installation.
-
This element of the job was completed in half of the time that the traditional methods would have taken.
-
It worked out cheaper than wiring with cable and trunking.
-
If extra light fittings needed in the future, simply plug in another tap off – no wiring needed!
The end user was so pleased with the time it took and the end result that he quickly authorised phase 2 of the installation to commence. Once again, the goods were delivered to the factory within 2 days of order.
When the contractor was questioned why he was using Graziadio GLS Lighting Busbar for this project, his answer was simple:
“It looks better, it takes half the time to install and works out cheaper than using cable and trunking, it’s a no brainer!”
The finished project shows 3 x 72m runs of GLS lighting busbar. Our customer believes this saved 50% time on installation.