This project demanded the development of a complete steel cable trunking system, with bespoke requirements including all associated accessories. Specially sized overall dimensions and irregular compartmentalised construction was achieved to the customer's satisfaction. The project required close communication between specifiers, contractors, electrical wholesaler and Tamlex the manufacturer.
Since the house was of high visual historical importance, the necessary cable management system needed to be of a design and installed with minimum disruption and intrusion to the fabric of the building.
The building is used for prestigious annual events, with London Fashion Week being a key fixture in the calendar. This meant the adherence to strict project schedules was critical.