Login

 Register

60% less install time: Pre-assembled Stack Solutions

17-12-2020


PMA

PAM have now launched a new pre-assembly service for the Ensign cast iron above ground drainage system

Small improvements in productivity add up to large savings for the contractor.  Our new range of pre-assembled cast iron above ground drainage and soil systems save the installer money and reducing the install time by up to 60%. The beauty of them is they are preassembled at our Telford factory and delivered ready to install on site.

The service offers so much more than just pre-assembly.
This service requires close collaboration between the complete supply chain. We will manage the process from product selection, bespoke stack design, manufacture, distribution with our partners and on site assistance. The results will provide a reduction of time on-site with the added assurance of the consistent product assembly.

PMA