Login

 Register

Urgent & Emergency Care Centre, Walsall

30-06-2022


1

Gripple's Fast Trak and UniGrip suspension solutions were used to install electrical containment, 2D and 3D modules at this hospital project in Walsall, West Midlands.

By using Fast Trak, installers from Monarch Electrical Contractors were able to save a considerable amount of time and labour costs whilst also increasing carbon efficiencies and minimising health and safety concerns across the project.

Tilbury Douglas Engineering were also impressed with how Gripple’s UniGrip wire rope kits allowed them to drastically speed up the installation of 2D and 3D modules throughout this project. For more info on the project please watch our case study video below.

Fast Trak by Gripple – Pre-Fabricated Channel System for M&E Services

4

Our Fast Trak pre-fabricated channel system will change the way you install suspended M&E services forever!

Designed by our engineers, for engineers. If you’re installing electrical containment, pipework, ductwork or other mechanical services you need to know about Fast Trak.

Our innovative Fast Trak system is made up of our prefabricated slotted channel, our patented 'Track' and 'Cartridge', allowing you to safely install a complete trapeze bracket up to six times faster than traditional rod and strut.

Click here to discover more about our Fast Trak range.

"Logistically, using Fast Trak is second to none for us, it's such a benefit! It comes pre-packed with a handle and is easy  to carry around site. It helps us speed up the installation process"

Director, Monarch Electrical Contractors

UniGrip by Gripple – Wire Rope Suspension Kits for M&E Services

56

Our UniGrip wire rope suspension kits are designed for the fast suspension of cable containment, pipework, ductwork, HVAC systems and modules, including multi-tier installations.

Click here to discover more about our UniGrip range.

"If we had suspended traditionally it would have taken us a week to get those modules up. By using Gripple wire rope kits, we were able to have the modules delivered in the morning and installed by the afternoon. The time saving was immense."

Senior Project Manager, Tilbury Douglas Engineering

1
ll;l
hfghfghgfh
8